Water purification plant
Project: Construction of San Lorenzo water treatment plant (160 lps)
Location: Sinaloa, Mexico.
Start date: September 20, 2021
Activities:
- Installation of feed pipes from the collection.
- Construction of flocculation tanks, reinforced concrete f’c=300 kg/cm².
- Construction of cylindrical sedimentation tanks, reinforced concrete f’c=300 kg/cm².
- Construction of cylindrical filtration tanks, reinforced concrete f’c=300 kg/cm².
- Construction of storage tanks, reinforced concrete f’c=300 kg/cm².
• Electromechanical equipment and operation tests of the water treatment plant.