Construction of photovoltaic Plant – Castelvetrano

Construction of photovoltaic Plant – Castelvetrano

Project: “MT-AT” photovoltaic plant (10 mW)
Location: Castelvetrano, Italia.
Start date: June 1, 2024
Activities:
– Puntos Topográficos
– Pile Driving
– Enabling and assembly of metal structure in aluminum and stainless steel
– Assembly of monocrystalline solar panels.

 

WhatsApp Image 2024-07-07 at 14.12.02 (1)
WhatsApp Image 2024-07-07 at 14.12.02
WhatsApp Image 2024-07-07 at 14.12.03 (1)
WhatsApp Image 2024-07-07 at 14.12.03
WhatsApp Image 2024-07-07 at 14.12.04
WhatsApp Image 2024-07-07 at 14.12.05 (1)
WhatsApp Image 2024-07-07 at 14.12.05
WhatsApp Image 2024-07-07 at 14.12.06
WhatsApp Image 2024-07-07 at 14.13.27
WhatsApp Image 2024-07-07 at 14.13.28 (1)
WhatsApp Image 2024-07-07 at 14.13.28 (2)
WhatsApp Image 2024-07-07 at 14.13.28