Construction of photovoltaic Plant – Tuscania

Construction of photovoltaic Plant – Tuscania

Project: “DCS” photovoltaic plant (30 mW)
Location: Tuscania, Italia.
Start date: April 1, 2024
Activities:
Puntos Topográficos
– Pile Driving
– Enabling and assembly of metal structure in aluminum and stainless steel
– Assembly of monocrystalline solar panels.

 

01
02
03
04
05
06
07
08
09