Construction of photovoltaic Plant – Tuscania
Project: “DCS” photovoltaic plant (30 mW)
Location: Tuscania, Italia.
Start date: April 1, 2024
Activities:
– Puntos Topográficos
– Pile Driving
– Enabling and assembly of metal structure in aluminum and stainless steel
– Assembly of monocrystalline solar panels.