Water purification plant
Project
Costruzione dell’impianto di trattamento acque di San Lorenzo (160 lps)
Place
Cananea, Mexico
Start date
20 September 2021
Activities
- Installation of supply pipes from the collection
- Flocculation tank construction, reinforced concrete f'c=300 kg/cm²
- Construction of cylindrical, reinforced concrete sedimentation tanks f'c=300 kg/cm²
- Construction of cylindrical filtration tanks, reinforced concrete f'c=300 kg/cm²
- Flocculation tank construction, reinforced concrete f'c=300 kg/cm²
- Electromechanical equipment and operational tests of the water treatment plant